Private, free guide — not a government website. Apply only on the official portal.

We could not confirm it is still open

Solar pump subsidy (PM-KUSUM Component-B), Rajasthan

Funded, but no order confirms it is still open: Rajasthan Budget Speech 2026-27 (11 Feb 2026) (11 Feb 2026, Para 168: राज्य में सौर पम्प संयंत्रों के प्रोत्साहन हेतु आगामी वर्ष 50 हजार (पचास हजार) सोलर पम्प संयंत्रों की स्थापना की जायेगी। इस पर एक हजार 500 करोड़ (एक हजार पांच सौ करोड़) रुपये का व्यय किया जायेगा।)

Solar pump (PM-KUSUM B) · Commissionerate of Horticulture, Government of Rajasthan · State scheme

An off-grid solar pump of 3 to 7.5 HP for a farmer with no farm electricity connection: 60% subsidy (30% Centre + 30% State), a fixed amount per pump size — ₹1,09,392 for 3 HP, ₹1,68,518 for 5 HP, ₹2,28,406 for 7.5 HP — and ₹45,000 more for SC/ST farmers.

Lead benefit
100%of the cost, at most
Components
2each read from the document
Who can apply
5kinds of applicant
Closing date
Seasonalsee “When to apply”

What it pays

60%of the cost, at most

A fixed subsidy by pump size: ₹1,09,392 for 3 HP, ₹1,68,518 for 5 HP and ₹2,28,406 for 7.5 HP; a 10 HP pump gets the 7.5 HP amount and you pay the rest.

Read from Rajasthan PM-KUSUM-B revised rates and subsidy from 22.09.2025 · clause Revised rate table "Solar pump category wise revised rate and subsidy effetive from 22.09.2025", General Farmer — Subsidy column, S.N. 1–28 · p. PDF p.18 (letter of 07.10.2025, p.1) · Our copy (PDF)
What the document says, word for word

Only for a farmer who has no farm electricity connection, owns at least 0.4 ha (0.2 ha for ST farmers in notified tribal areas for 3 and 5 HP) and a water source, and will use drip, mini-sprinkler or sprinkler (cl. 2, 3). You pay the rest of the price (e.g. ₹93,541 for a 3 HP AC surface pump costing ₹2,02,933) and can take a bank loan for up to 30% of the cost (cl. 9.3). Your name goes to the power company and you cannot later get a subsidised farm electricity connection (cl. 4.3). Bills raised before 22.09.2025 keep the old rates (letter of 07.10.2025, point 1).

“9.1 पीएम कुसुम कम्पोनेंट– बी के तहत ऑफ ग्रिड स्टेन्ड अलोन सौर ऊर्जा पम्प परियोजना अन्तर्गत 60 प्रतिशत (30 प्रतिशत केन्द्रीय मद तथा 30 प्रतिशत राज्य मद) अनुदान देय होगा। — Solar pump category wise revised rate and subsidy effetive from 22.09.2025: General Farmer Subsidy 109392 (3 HP), 168518 (5 HP), 228406 (7.5 HP and 10 HP)”
100%of the cost, at most

SC and ST farmers get ₹45,000 more on any pump size, which lowers their own share by that amount.

Read from Rajasthan PM-KUSUM-B revised rates and subsidy from 22.09.2025 · clause Revised rate table, column "Additional subsidy for SC/ST Farmer — Additional subsidy" 45000, S.N. 1–28 · p. PDF p.18 (letter of 07.10.2025, p.1) · Our copy (PDF)
What the document says, word for word

The letter prints a flat ₹45,000 for every pump size (e.g. a 3 HP AC surface pump: farmer share ₹48,541 instead of ₹93,541). It is paid on top of the general subsidy. The 100% here is only how we show a fixed amount: you never get more than ₹45,000 from this line.

“Additional subsidy for SC/ST Farmer — Additional subsidy 45000 (S.N. 1–28)”

How much can I claim?

Enter pump capacity to see the figure.

Read from Rajasthan PM-KUSUM-B revised rates and subsidy from 22.09.2025 · clause Revised rate table "Solar pump category wise revised rate and subsidy effetive from 22.09.2025", General Farmer — Subsidy column, S.N. 1–28 · p. PDF p.18 (letter of 07.10.2025, p.1) · Our copy (PDF)

Only for a farmer who has no farm electricity connection, owns at least 0.4 ha (0.2 ha for ST farmers in notified tribal areas for 3 and 5 HP) and a water source, and will use drip, mini-sprinkler or sprinkler (cl. 2, 3). You pay the rest of the price (e.g. ₹93,541 for a 3 HP AC surface pump costing ₹2,02,933) and can take a bank loan for up to 30% of the cost (cl. 9.3). Your name goes to the power company and you cannot later get a subsidised farm electricity connection (cl. 4.3). Bills raised before 22.09.2025 keep the old rates (letter of 07.10.2025, point 1).

Who can apply

  • Other farmer
  • Small or marginal farmer
  • SC farmer
  • ST farmer
  • Woman farmer

Papers you need

  • Jan Aadhaar card (cl. 5.1)
  • Jamabandi or passbook copy showing land ownership (cl. 5.2)
  • Affidavit that you have an irrigation water source and no farm electricity connection (Annexure-1, cl. 5.3)

How to apply

  1. Apply on the Raj Kisan Sathi portal through an e-Mitra or with your own SSO ID (cl. 4.1).
  2. Pick a listed supplier firm; it surveys your water source and proposes the pump size (cl. 11.2–11.4).
  3. Sign the three-party agreement on ₹500 stamp paper and, after online approval, deposit your farmer share with the District Horticulture Development Society (cl. 11.5–11.7).
  4. The firm installs the pump within 120 days of the work order; after physical verification the subsidy is paid to the firm (cl. 11.9, 12).
Apply on the official portal ↗

Applying is free. Never pay anyone to apply for you.

When to apply

Not confirmed for 2026-27. The central PM-KUSUM allowed no new projects after 31.12.2025 (MNRE OM, 28 Mar 2026) and PM-KUSUM 2.0 is awaited, so new applicants cannot count on the central 30%. Wait for PM-KUSUM 2.0 or a Rajasthan order for 2026-27.

Combining with other schemes

  • PM-KUSUM: cannot be combined